Welding is managed as a special process under ISO 9001:2015 clause 8.5.1(f) — a process whose output cannot be fully verified by inspection alone. Our framework is aligned to ISO 3834-2 and overseen by a Responsible Welding Coordinator.

Welding Management

Documentation hierarchy

DocumentStandardPurpose
WPS — Welding Procedure SpecificationASME IX / ISO 15609-1The controlled instruction issued to the workface
PQR — Procedure Qualification RecordASME IX / ISO 15614-1Mechanical test proof that the WPS produces sound welds
WQT — Welder QualificationASME IX QW-300 / ISO 9606-1Proof the individual welder can execute that WPS in range
Welder Register & ContinuityISO 9606-1Six-monthly continuity; expired welders are locked out
Weld Map / Numbering PlanProject specificEvery joint numbered and located — no anonymous welds
Consumable ControlAWS A5 / ISO 3834-2Batch traceability, baking, quivering, issue and return
Ferrite / PMI RecordsASTM E562 / ASTM A751Duplex ferrite balance and positive material identification
PWHT RecordsASME VIII / ASME IXCalibrated chart records where heat treatment is specified

Metallurgical Control

Stainless steel integrity controls

  • Dedicated stainless bay with stainless-only discs, brushes, clamps and slings — no carbon migration
  • Plate delivered PVC-coated where practical; coating retained until final fit-up
  • Full inert back-purge with oxygen verified below 50 ppm before root deposition
  • Heat input and interpass limits enforced to prevent sensitisation and sigma-phase formation
  • Duplex ferrite verified within the 35–65% acceptance band (ASTM E562)
  • Pickling and passivation to ASTM A380 / A967, verified by ferroxyl or copper sulphate test
  • PMI by XRF on 100% of stainless parent material and filler batches
Welder performing a root run on a stainless steel spool

Non-Destructive Testing

NDT methods and application

NDT is executed by SANAS-accredited or client-approved inspection bodies, with technicians certified to ISO 9712 / SNT-TC-1A Level II as a minimum. Scope and extent are defined in the project Inspection and Test Plan and agreed before fabrication release.

MethodStandardTypical Application
Visual InspectionISO 17637 / AWS D1.1100% of welds, fit-up and final
Radiography (RT)ASME V / ISO 17636Butt welds in pressure and critical piping
Ultrasonic (UT)ASME V / ISO 17640Full-penetration structural and plate welds
Magnetic Particle (MT)ISO 17638Carbon steel fillet and attachment welds
Dye Penetrant (PT)ISO 3452-1Stainless steel and duplex welds
Coating InspectionISO 19840 / SSPCDFT, adhesion pull-off, holiday detection

Safety, Health & Environment

Zero harm as a design requirement

CommitmentHow It Is Managed
Zero Fatalities, Zero Permanent Disabling InjuriesNon-negotiable target, driven from board level
Monthly ReportingTRIFR, LTIFR, near-miss frequency and leading-indicator participation
Risk ControlWorking at height, confined space, hot work, lifting and structural collapse regimes
Hazardous SubstancesSDS register with exposure control for acid and solvent handling
Emergency ResponseMuster, medical, spill, fire and site-specific scenarios with drill records
EnvironmentEffluent containment, waste segregation and rehabilitation on demobilisation

Management System

Certification and code framework

ISO 9001:2015

Quality Management System

ISO 45001:2018

Occupational Health & Safety

ISO 14001:2015

Environmental Management

ISO 3834-2

Comprehensive Welding Quality

ASME IX / ISO 15614-1

Procedure Qualification

ASME B31.3

Process Piping Design & Fabrication

API 650 / EN 14015

Welded Storage Tankage

ISO 9712 / SNT-TC-1A

NDT Personnel Certification